Posts By: James Fick

Job of the Month – April 2017

Description of Work: Replaced main house roof with new Vermont Canadian Black slates, 20oz copper flashings and 20oz copper ridge caps. Reconfigured and reinstalled existing snow rail system as per Alpine Snow guards engineered specifications. Removed and saved Hardie siding at (8) dormers, added AZEK trim and ‘Z’ flashing where dormer sidewalls join roof, reinstalled Read More

Job of the Month – March 2017

Estimator: Todd Mullenax Project Manager: Bryan Zielinski Crew: Dan Puckett, Gary Gamber, Ryan Donet, Ralph Kuehne,     Josh Auvil, Nick Nowak, Poncho Valdez, Mike Kelly, Mark Fick Description of Work: Replaced all built-in gutters with new 20oz copper, replaced tree damaged rafters, sheathing and molding on south elevation and painted new molding, replaced rotted rafters and Read More

How to make a Successful Construction Investment

What Major Risks Do Homeowners Face When Making a Home Remodeling Decision? According to the Certified Contractors Network (CCN), “homeowners have a lot of fear when they are faced with making a home improvement decision. They worry about whether or not they are making the right choice when it comes to contractors. Will they be Read More

Common Reroofing Questions Answered:

For Maryland property owners, there are many reroofing options that are viable solutions, but by far the most common roof type is asphalt shingles. Below are some common questions that are important part of the reroofing process, and should not be ignored. For one reason, it’s required by law. And, secondly, it’s just good roofing Read More

Job of the Month – February 2017

Description of Work: Replaced all existing roofing on the main house with new 12″x20″ Vermont Black slates, .032 Brown aluminum eave flashings, .032 white aluminum rake flashings, 20oz copper apron & base flashings, 20oz copper hip & ridge caps, 16oz copper counter flashings, .032 white aluminum trim wrap at front and rear dormers and replaced Read More

Job of the Month – January 2017

Job of the Month – January 2017 Description of Work: Replaced rear main roof section with new 16oz copper standing seam roof, replaced gutter with new 16oz copper gutter, replaced rotted roof sheathing and rotted clerestory framing, replaced (2) rotted clerestory window sashes and (1) rotted window frame with new customer supplied Pella wood windows, Read More