Job of the Month – April 2018

Estimator: Todd Mullenax Foreman:  JP Preston Crew:   Alton Lott,  Ray Dunivant,  Sam Scheltema,  Ralph Kuehne, Ryan Donet Description of Work:  Repointed the tread stones and brick risers on the right side stairway, and relayed stone walkway from the stairs to the front porch.   More pictures click here

Job of the Month – March 2018

Description of Work:  Replaced all sloped cedar shake roofing with new Autumn Blend colored Davinci synthetic shakes over ice and water shield at eaves, walls and chimneys and 2 layers of 30lb felt underlayment. Replaced all eave, rake and counter flashings with 16oz copper and all base, apron and cricket flashings with 20oz copper. Furnished Read More

Job of the Month – February 2018

Description of Work: Rebuilt chimney chase that had blown over using new 2x lumber tied in to the existing house framing and new 1/2″ CDX plywood sheathing to match existing design. Installed a new double walled chimney flue and termination rain cap to tie-in to the existing chimney flue. Installed new copper flashings at roof Read More

Job of the Month – January 2018

  Description of Work: Replaced copper bow window roof with new 16oz historic double lock standing seam copper roof. Project Manager: Galen Desch Crew: Nick Santana, Mike Kelly Estimator: Jamie Fick  

Job of the Month – December 2017

  Description of Work: Replaced entire rear deck boards, deck access stairs and basement entry stairs with new slate gray colored Azek grooved decking secured with Azek Conceal-Loc hidden fasteners and new 5/8″ white Azek trim around perimeters and tread risers, replaced railings at deck and basement entry stairs with new 4″ x 4″ pressure Read More