News

Job of the Month – March 2020

Description of Work: Replaced upper rear and uppermost center flat roofs with a fully adhered 60mil black EPDM roof system. Removed and reinstalled the existing aluminum coping on the upper rear roof parapet walls, and fabricated and installed new .032 white aluminum coping on uppermost center roof parapet walls. Replaced the roof top decks and Read More

Job of the Month – February 2020

Description of Work:  Rebuilt main house chimney to match existing size and design using Cushwa Modular Rose Red colored bricks. Spot pointed various areas of stone foundation walls at ground level. Estimator: Walt Willson Project Manager:  James Preston Crew: Alton Lott, Mike Carter, Rex Cox, Nick Nowak, Jack Tyson

Job of the Month – January 2020

Description of Work: Replaced second floor rear roof with a Kwila colored, fully adhered, walkable PVC Dec-Tec membrane roof system. Replaced associated flashings and K style gutter with .032 brown aluminum flashings and gutter. Removed and rebuilt the third floor mechanical room with 2″ x 4″ framing, Hardie siding, AZEK trim, 60 mil black EPDM Read More

Job of the Month – December 2019

Description of Work:  Replaced various sections of gutter and downspouts on the main house with new 5″ copper half round gutters secured using copper roof mounted shanks and circles, and new 3″ round copper downspouts. Replaced existing wire loop snowguards with new Sieger Model “C” Bronze snowguards at all areas where the gutters were replaced, Read More

Job of the Month – November 2019

Description of Work:  Rebuilt left side chimney down to the lower roof level with matching brick and mortar, replaced all chimney base & counter flashing at both the upper and lower roof levels with copper, and fabricated & installed a new Freedom Gray chimney cap with a screened hood. Estimator: Jamie Fick Foreman:  James Preston Read More