News

Job of the Month – October 2019

Description of Work:  Replaced various low slope roofs on the Church, Rectory, Girl’s school and lower bump out with a fully adhered black 60mil EPDM roof system with tapered ISO insulation as specified. Installed a new drain, white aluminum eave and rake flashings and 16oz copper counter flashings at the Church roof. Installed 16oz copper Read More

Job of the Month – September 2019

Description of Work:  Replaced all roofing with a 24 ga Black Galvalume snap lock 550 standing seam roof system with fascia and ridge vent and RT 300 color matched snowguards. Replaced all fascia, freeze, soffit and rake trim with Azek material. Replaced all gutters and downspouts with 6″ black half round Nordic gutters and 4″ Read More

Job of the Month – August 2019

Description of Work:  Replaced right side sunroom built-in gutter and roof with custom 20oz copper built-in gutter and a 16oz standing seam copper roof. Replaced downspouts with 16oz copper downspouts. Replaced rotted framing and sheathing at various locations. Project Manager:  Andy Corn Crew:   Sam Scheltema, Jack Tyson, Rakeem Spann, Thomas Brooks  Estimator: Walt Willson

Job of the Month – July 2019

Description of Work:  Partially rebuilt top bell portion of one chimney, and fully rebuilt second chimney from the roofline up, re-flashed both chimneys with 20oz copper and installed new stucco on both chimneys in their entirety. Fabricated and installed a stainless steel chimney cap on one chimney, and a 4″ thick masonry crown on the Read More

1 2 3 4 19