Posts By: Jeffrey Fick

Employee of the Month – January 2015

Ralph Kuehne – Employee of the Month – January 2015 Ralph made his production goal again in January. He has a great attitude and work ethic. He communicates well with the office, his customers, and his crew.  Ralph continues to work everyday to satisfy his customers and meet his goals.  Keep up the great work.

Job of the Month – January 2015

Description of Work: For rebuilding top 18 courses of front right side chimney & for installing new concrete crown & 2 black galvanized flue caps.  For re-flashing front right side chimney with copper flashing.  For replacing rotted trim on 3 windows & for touch up painting as needed.  For replacing siding & trim on the Read More

Job of the Month – December 2014

Description of Work: Furnish and install (2) Pinnacle Wood Awning windows in bathroom, (1) Pinnacle Wood Awning Window in kitchen and (1) Pinnacle Wood Double Hung Window in kitchen, remove and replace rear porch ceiling with new kiln dried Southern Yellow Pine tongue & groove ceiling and all related trim and apply (2) coats of Read More

Employee of the Month – December 2014

Gary Gamber – Employee of the Month – December 2014 His skills have been improving and he is able to do much more on his own now which helps not only himself, but also the crew and the company as a whole. Gary always has a good attitude and is always willing to assist anyone Read More

Job of the Month – November 2014

Description of Work: Remove existing built up roof, gutters and railing on left side lower roof and install a new fully adhered DecTec PVC roof system, new flashings, new 5″ K style white aluminum gutters & downspouts and a new white vinyl railing system, replace lower rear gutters with new 5″ K style white aluminum Read More

Employee of the Month – November 2014

Alex Mergler Employee of the Month – November 2014 “Hard working, always on time, & wants to make the install goal every job every time. Keeps his truck clean & neat.”

Job of the Month – October 2014

Description of Work: Remove existing slate roof & install new Vermont unfading grey 10×20 slate with copper flashings and brown aluminum eave and rake metal. Roof was installed with 2 rows of Sieger boss galvanized snow guards.  Remove existing shed dormer roof & install new 60mil black roof. Estimator: James Ackerman Project Manager: Steve Patrick Read More