May 2008

1. Removed old doors and windows and replaced with new Loewen wood windows. All interior trim was custom fabricated on site to blend with original design of house. All new windows were stained inside and out. 2. Replaced old pegboard soffit on back of house with new sanded plywood soffitt and stained all new soffitt. 3. Rebuilt rotted framing around all replacement window and soffit areas as needed and rebuilt brick foundation wall as needed. 4. Removed old wood deck on back of house and discarded. Installed custom fabricated wood cedar siding to fill in area on house where deck was removed and stained all siding to match. 5. Replaced rotted vertical siding on exterior walls around new windows with new custom fabricated wood cedar siding to match original design and stained all new siding. 6. Removed and discarded old fence in rear yard. 7. Stained all patio rails, garden blocking, and new fencing around property. 8. Rehung and adjusted 5 interior doors and 1 entry door for smoother operation.

April 2008

Flashings on slate roof replaced, installed coping on brick walls, install window flashings, re-build front porch, flat seam copper roof on front entrance.

March 2008

Replace 5 EPDM roofs and copper built-in gutters also remove & reinstall railings.

February 2008

Replace BUR roof with new EPDM roof.

January 2008

Replace tin roof with new standing seam copper roof, replace aluminum gutters & downspouts with new copper half round gutters & downspouts, add snow guards to slate roof section, re-flash chimney on slate roof & replace rotted soffit & fascia lumber

December 2007

Replace (2) dormers roofs with standing seam copper, replace molding & 1 downspout

November 2007

This project was especially challenging because the main structural roof beam was cracked and required temporary internal bracing and the installation of two laminated support beams prior to the removal of the old built-up roof and installation of a new EPDM roofing system.

October 2007

Shingle re-roofing, siding replacement, replace fascia & trim, replace gutters, point up & wrapping windows

September 2007

Replace 2 Copper Flat Seam Roofs

August 2007

Replace Barrel Dormer Roofs, Flat Roofs & Stucco Work

July 2007

EcoStar Re-Roofing, EPDM Re-Roofing, Copper Gutters & Downspouts, Masonry (Brick & Stucco), Re-Building Porch, & Shutter Repair.

June 2007

Project Description: Wood Shingle, EPDM Re-Roofing, Gutters & Downspouts

May 2007

Remove Built-Up Roof - Install NEW EPDM Roofing, New Downspouts

April 2007

We replaced the EPDM roof, and also the molding along the roof line.

March 2007

We replaced dormer flashings on the slate roof, and replaced an EPDM roof. We also made repairs to existing EPDM roofs.

February 2007

Reroof main house, pool house, tool shed, and water shed with new wood shingles and replace flashings with new copper flashings. Install new half round copper gutters and downspouts, cut and repoint stone chimney and south side wall, installed 2 new copper chimney caps, rebuilt and repainted rotted wood shutter and repaired wood entry door on main house. Replaced rotted fascia, decking, dormer trim, and detailed rake trim on shed and repaired wood barn door.

January 2007

Slate re-roofing & new gutters & downspouts on front of house. Replace chimney flashings & valley flashings on back of house, as well as a section of gutter.

December 2006

Replacing & painting all wood windows & doors in the sun room & for installing a drop down attic stairway.

November 2006

Replaced (2) bay window roofs with standing seam copper & replaced rotted lumber on the bay window roofs & replaced rotted balusters on the back porch.

October 2006

Replace excising wood shake roof with EcoStar Seneca Tiles & brown aluminum & copper flashings. Drywall work.

September 2006

Slate re-roofing on back section, replacing (3) skylights, replacing rounded valley flashing, replacing (2) chimney flashings, installing copper ridge cap on all ridges, aluminum coating metal roof, & re-pointing (2) chimneys.

August 2006

Replaced built-in gutters. Replaced all flashings on slate roof. Also, replaced custom copper spoutheads & downspout.

July 2006

Replaced built-in gutters & front porch roof with EPDM. Re-built front porch railing. Replaced back shingle roof section & replaced all dormer flashings on slate roof. Also, replaced custom copper spouthead & downspout.

June 2006

Replace copper barrel dormer roofs & flashing. Replace chimney flashing, vent pipe collars. Replace broken & missing slate.

May 2006

Replacing all gutters & downspouts, replacing dormer valley flashing on South Side, chimney flasing & wall flashing section on North Side.

April 2006

Replace copper barrel dormer roofs & flashing. Replace chimney flashing, vent pipe collars. Replace broken & missing slate. Replace wood trim & crown molding on dormers.

March 2006

EPDM Re-roofing. Replace back of home with new slate & copper flashings. Copper roof on front bay window. New copper gutters on front & rear of home.

February 2006

Replace existing slate roof on front of home with new 11X22 Bangor Slate, replace rotted wood siding on front dormer, re-paint siding, re-paint side windows & rake boards on front of home, remold existing snow rail brackets.

January 2006

EPDM Re-roofing, re-building cracked rafter beam, custom copper box gutter & downspout, & copper flashings.

December 2005

Replace all valley flashings & all chimney flashings, replace all broken & missing slate, replace (3) flat roof sections with EPDM & copper flashings, replace (1) skylight, replace copper water table & built-in gutter on side porch, re-point all (4) chimneys & re-build the top courses. Remove the slate & install ice shield on the eaves & install new snow guards.

November 2005

Replace existing metal siding & flashing with new custom fabricated .032 aluminum panels & flashing.

October 2005

Replace copper gutters, downspouts & snow guards.

September 2005

Shingle re-roofing, EPDM re-roofing, replace built-in gutters, re-point stone chimney.

August 2005

Remove existing tile & install new underlayment & relay tile. New gutters & on whole house. New EPDM roofing on side porch roof.

July 2005

Replace all copper gutters, downspouts, & spoutheads. Remove the slate at all of the eaves & install ice & water shield & new snow guards, re-point & re-flash (2) stone chimneys, replace valley flashings, replace vent pipe flashins, replace side wall flashings & replace broken & missing slate throughout the roof.

June 2005

Slate re-roofing, & replacing copper gutters & downspouts on the front of the house.
Home | Project of the Month | Services | Request Estimate
Preventative Maintenance | Job Opportunities | Professional Links | Site Map

Phone: 410.889.5525 • Fax: 410.889.0322 • E-mail: info@fickbros.com
1200 E 25th Street, Baltimore, Maryland 21218

© Copyright 2002-2008 The Fick Bros. Roofing Company