Job of the Month – January 2020

Description of Work: Replaced second floor rear roof with a Kwila colored, fully adhered, walkable PVC Dec-Tec membrane roof system. Replaced associated flashings and K style gutter with .032 brown aluminum flashings and gutter. Removed and rebuilt the third floor mechanical room with 2″ x 4″ framing, Hardie siding, AZEK trim, 60 mil black EPDM roof, and (1) new Thurma-Tru Smooth Star 60″ x 80″ exterior double door unit. Replaced (1) sliding glass door unit and (1) picture window on the rear third floor level, and (2) sliding glass door units on the front second and third floor levels with new Western Window sliders and picture window units.

Estimator: Walt Willson

Project Manager: Ralph Kuehne

Crew: Ryan Donet, Dan Beam, Willian Islaes, James Preston, Alton Lott, Rakeem Spann, Cowboy Williams, Eric Eicher, Mike Kelly